12-10-2010, 11:58 AM
The two empties were pulled from track 1:
Moved past the turn-out:
The switchman threw the turn-out from Track 1 to Track 2:
Then the two empties were pushed onto Track 2 and left there. This left Track 1 clear so the loaded cars could be set out.
Moved past the turn-out:
The switchman threw the turn-out from Track 1 to Track 2:
Then the two empties were pushed onto Track 2 and left there. This left Track 1 clear so the loaded cars could be set out.
Three Foot Rule In Effect At All Times