For the double track section I selected Walthers Cornerstone Urban Steel Overpass.
Open the box and this is what the parts look like.
First part to be assembled is the steel super structure.
Next is the roadway section.
Posts: 2,160
Threads: 48
Joined: Dec 2008
Add the deck.
The railings.
Place the bridge on the roadway section.
Next is removing the foam.
Posts: 1,127
Threads: 86
Joined: Nov 2010
Tom,
will this become a 1:87 reissue of the 11' 8" bridge?
https://www.youtube.com/watch?v=3AbU_CnkBiE
Even since they raised to 12' 8" the fun is'nt over.
Lutz
Posts: 2,160
Threads: 48
Joined: Dec 2008
(03-21-2024, 06:30 AM)Schraddel Wrote: Tom,
will this become a 1:87 reissue of the 11' 8" bridge?
https://www.youtube.com/watch?v=3AbU_CnkBiE
Even since they raised to 12' 8" the fun is'nt over.
Lutz
I will have to run a few trucks under to see what happens.
BTW I have that video along with a few others saved.
Posts: 2,429
Threads: 63
Joined: Dec 2008
That would make a good excuse why no cars are moving on the road.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Posts: 2,160
Threads: 48
Joined: Dec 2008
I begin removing the foam
Do test placement of the bridge.
A look from above. At this time I was thinking I could salvage the track.
Posts: 2,160
Threads: 48
Joined: Dec 2008
Remove more foam so the whole bridge can fit.
Another test. However I had to remove the roadway because I still needed to do more removal.
A view from above.
Posts: 1,096
Threads: 31
Joined: Mar 2009
Great work Tom. Very impressive.
Posts: 1,127
Threads: 86
Joined: Nov 2010
(03-24-2024, 02:46 PM)LiveSteamer Wrote: Great work Tom. Very impressive.
That i copy
Lutz
Posts: 230
Threads: 15
Joined: Nov 2015
Coming along amazingly.
————————————————————————————
Modeling the East Broad Top as it was between 1937-1942
~Amanda
Posts: 2,160
Threads: 48
Joined: Dec 2008
Thanks folks for the kind words.
Here is the area for the first bridge cleaned out.
Now I add the abutments to the structure.
Test placement of the bridge.
Posts: 2,160
Threads: 48
Joined: Dec 2008
Add the track to the test.
Remove ties to fit the track over the bridge.
Set the tracks across the gap.
Posts: 2,160
Threads: 48
Joined: Dec 2008
Next is the second bridge which will carry the third track. For this bridge I plan to use a thru girder bridge.
Here are all the parts
Assemble the girders
Add the bridge deck
Checking to see if the bridge fits.
Posts: 2,160
Threads: 48
Joined: Dec 2008
Another view of the test fitting
The kit came without abutments. Now it is time to add them.
The parts
Checking to see if the abutment fits
Add the bridge deck to the abutments.
Posts: 2,160
Threads: 48
Joined: Dec 2008
Determining the placement of the bridge.
Marking the area that needs to be removed.
Area removed.
Testing the placement of the bridge.