![]() |
|
E-paws spring 2010 bash challenge - Printable Version +- (https://bigbluetrains.com) +-- Forum: Photographer's right of way (https://bigbluetrains.com/forumdisplay.php?fid=37) +--- Forum: Contests & Challenges (https://bigbluetrains.com/forumdisplay.php?fid=9) +--- Thread: E-paws spring 2010 bash challenge (/showthread.php?tid=2301) |
Re: E-paws spring 2010 bash challenge - nachoman - 02-12-2010 Nice work on those curved handrails. E-paws spring 2010 bash challenge - e-paw - 02-14-2010 If you look at the the prototype photo you'll notice that the windows have a sunshades. I cut them from some scrap styrene and installed them in there proper place. As for the undercarriage I'm using a Proto 2k north eastern caboose as a guide. It shows all the brake rigging and other details. It also has a solid center beam, The Varney frames do not, this is a great place to hide some weight. So, I filled them in with some lead and covered it with some green putty.I also installed The A-B valve and reservoir in there correct place. The photo also shows a large tool box hung under the frame. I fabricated it from some of the same scrap as the sun shades. I also used the space to hide some more weight that was also covered in putty. E-paws spring 2010 bash challenge - e-paw - 02-14-2010 With all the major changes complete It's off to the paint shop for priming.It's just some rattle can white primmer. E-paws spring 2010 bash challenge - e-paw - 02-15-2010 Today's job was to finish the brake rigging, air lines, and air hoses. This is the first time I have ever tried this from scratch, I'm pretty happy with the results. Re: E-paws spring 2010 bash challenge - Gary S - 02-15-2010 That brake rigging turned out very nicely indeed! You're doing some great work. And I will also comment on how the handrails turned out perfectly. E-paws spring 2010 bash challenge - e-paw - 02-20-2010 The interior was the order of business today. I started with the cabinates that suport the bunks in the center section. As a guide I used some prototype pics and the same P2K caboose as I did for the brake rigging. While they dried I asembeled the trucks, They are a Tichy Trains product and are a close enough match to the prototype. I mounted them temporarily as to protect the brake detail while I built the interior. E-paws spring 2010 bash challenge - e-paw - 02-20-2010 I measured out the location of the bunks and cemented them into place. On one side there is a bench and a desk, so they were the next to go in. E-paws spring 2010 bash challenge - e-paw - 02-20-2010 This side is off to a good start, I'll start the other side soon. Re: E-paws spring 2010 bash challenge - nachoman - 02-20-2010 very nice work! I especially like the brake rigging. Re: E-paws spring 2010 bash challenge - Ralph - 02-20-2010 I recognize the primer paint on a caboose like from my project that but that's where the similarity ends with your intricate work on brake rigging and interior details! I'm envious! Ralph E-paws spring 2010 bash challenge - e-paw - 02-27-2010 It was back to the paint shop today. The Interior got a few coats of Polly Scale D&H gray. E-paws spring 2010 bash challenge - e-paw - 02-27-2010 At the same time as all of that was going on the paint crew masked off the windows and gave the outside it's first coat of caboose red. Re: E-paws spring 2010 bash challenge - ngauger - 02-27-2010 I love looking at great detail work!!!! Fantastic!!!! Re: E-paws spring 2010 bash challenge - nachoman - 02-27-2010 Great work. E-paws spring 2010 bash challenge - e-paw - 02-28-2010 The paint crew was hard at work again on #580 and 582. The herald, stripes, and #'s are on . I also placed the safety reminder on the ends. |