![]() |
Freelance 2014-2 - Printable Version +- (https://bigbluetrains.com) +-- Forum: Branchline (https://bigbluetrains.com/forumdisplay.php?fid=45) +--- Forum: Layouts (https://bigbluetrains.com/forumdisplay.php?fid=46) +--- Thread: Freelance 2014-2 (/showthread.php?tid=6708) |
Re: Freelance 2014-2 - jonte - 08-14-2014 Now there's atmosphere for you ![]() Very nicely done, Reinhard - I think you've probably gone as far as you need to with the buildings; looking forward to the advent of the 'ground over'. Regards, jonte Re: Freelance 2014-2 - faraway - 08-15-2014 Started the ground works. I need to get a feeling how much degeneration is appropriate. ![]() ![]() and a barrier along the street ![]() Together with the adjacent untended yard is the overall impression changing ![]() Re: Freelance 2014-2 - Gumpoleon - 08-15-2014 Blimey, I hope to get to that level of detail one day! Very, VERY nice Work ![]() Martin Re: Freelance 2014-2 - Brakie - 08-15-2014 Reinhard,Looking good.. ![]() Now comes the hours of detailing and IMHO one of the best things about ISLs. Re: Freelance 2014-2 - faraway - 08-15-2014 Thanks for the kind comments. Yes, this part is the best one. I hope it will last for some more time. I worked my way from the center to the West end of the building today. ![]() ![]() ![]() Re: Freelance 2014-2 - Brakie - 08-15-2014 Reinhard,Those safety stripes(aka idiot stripes) on those support columns is very nice and adds realism.. ![]() I never thought about those stripes even though they are very common on those types of buildings... ![]() Come winter I'm going to continue the march on Slate Creek and move from Woodland Scenics 12" x24" black roadbed and track to adding structures,ballast etc. Re: Freelance 2014-2 - faraway - 08-17-2014 We have got a modern fence with a long sliding gate with a motor drive. ![]() ![]() A view along the street. The fence separates the street vs. the industry yard. ![]() Re: Freelance 2014-2 - jonte - 08-22-2014 Really atmospheric, Reinhard, and somewhat sinister: I keep expecting to see the chalk outline of a body over by the dumpster ![]() jonte Re: Freelance 2014-2 - faraway - 08-22-2014 Added some detail at the west side of the building ![]() and converted the track back to normal ballasted, added a sidewalk, handrails, steps and other details. ![]() The industry yard became more structured and detailed ![]() Adding details since some time builds up even more respect for Ray's "59th and Rust" layout. It is amazing how much and how many details he put on his layout ![]() monte Wrote:.... chalk outline of a body over by the dumpsterI like to have it neat and clean. It is in the dumpster.... :o Re: Freelance 2014-2 - long island jack - 08-23-2014 Steady on Reinhard,first time anyone respected me for my modeling ![]() Ray Re: Freelance 2014-2 - faraway - 08-24-2014 The industry at the west foreground got fenced and detailed. Three Trident furniture delivery cars are a lucky find on ebay. They are a perfect fit. ![]() ![]() ![]() ![]() Re: Freelance 2014-2 - torikoos - 08-25-2014 really looks great Reinhard. Cheers, Koos Re: Freelance 2014-2 - Twist - 08-26-2014 Hi Reinhard, very nice layout with fantastic details.Great work.Looking forward for more update pictures Cheers,Chris Re: Freelance 2014-2 - Painkiller - 08-29-2014 Looking good, Reinhard! ![]() Re: Freelance 2014-2 - Sumpter250 - 08-29-2014 Gumpoleon Wrote:Blimey, I hope to get to that level of detail one day! Very, VERY nice Work ![]() Have fun getting there ![]() ![]() ![]() |