![]() |
finally building layout - Printable Version +- (https://bigbluetrains.com) +-- Forum: Branchline (https://bigbluetrains.com/forumdisplay.php?fid=45) +--- Forum: Layouts (https://bigbluetrains.com/forumdisplay.php?fid=46) +--- Thread: finally building layout (/showthread.php?tid=569) |
Re: finally building layout - Bigsteel - 02-22-2009 dang,on the second pic i apparently broke off one off one of the braces on the side.ill have to replace that ![]() Re: finally building layout - doctorwayne - 02-22-2009 Hey, Josh, nice to see that reefer again. ![]() ![]() That bridge looks a lot more convincing to me, and you've done a nice job of blending the new parts in with the original span, too. ![]() ![]() Wayne Re: finally building layout - Russ Bellinis - 02-23-2009 You are getting a lot closer, both bridges would still tend to "rack" lengthwise under load. Think of a card table with no folding braces. The braces on the first bridge would work better if the bracing between the upper and lower stringers went full length to fully triangulate the bridge into a truss. Then the bracing between the legs and the bridge should start about 1/2 way up the leg or so and go directly to the center of the span. On the second bridge you should add braces between the outside legs and the inside legs of the bridge so that the entire bridge is one piece. You need to have it so that if you pick it up to install it in the layout without ties or track, the bridge is a one piece structure. Think in terms of the bridge supporting the track and not vice versa. Re: finally building layout - Bigsteel - 02-24-2009 ok russ,i see what your saying.the first bridge i kinda want to leave looking rickety,it helps convay that it was thrown together by some backs wods loggers ![]() ![]() ![]() ![]() i have also started to finish my mill and il post some more pics tonight. im kinda skipping around between builds to keep my interest.so tell me if you guys start to get confused at all my random pics ![]() Re: finally building layout - nachoman - 02-24-2009 hey, those bridges look awesome! Re: finally building layout - Bigsteel - 02-26-2009 heres some pics of the spot where the bridges will go,its just a small canyon with 2 small waterfalls and a pond.its the only place i've scenicked as of yet ![]() ![]() ![]() heres where that diorama will fit,i decided to use it as a liftout ![]() Re: finally building layout - Steve - 03-01-2009 Josh... Excellent work on...everything! ![]() ![]() ![]() I have book-marked your thread so I can follow your progress. Keep up the great work! Re: finally building layout - viperman - 03-03-2009 Those bridges look great, and like you said, put to gether by the loggers themselves Re: finally building layout - Bigsteel - 03-03-2009 thanks steve and steve ![]() ![]() Re: finally building layout - LiveSteamer - 03-04-2009 Cool. ![]() Re: finally building layout - Bigsteel - 03-04-2009 i did make some progress on the layout,im still waiting on code 70 rail joiners ![]() ![]() ![]() Re: finally building layout - Bigsteel - 03-22-2009 ok,so i havent forgotten about this thread,i still dont have the cam back so i cant post pics but i layed some more track (without joiners) ,i didnt feel like waiting so i used small strips of brass to hold them together ,so as you can tell i really want to run some trains ![]() ![]() ![]() ![]() Re: finally building layout - Russ Bellinis - 03-24-2009 I just checked my Walthers catalog and Micro Engineering and Shinohara both offer r-t-r turnouts in code 70. Micro Engineering only offers #6 & #8 while Shinohara offers them in #4 as well. Re: finally building layout - nachoman - 03-24-2009 Bigsteel Wrote:i did make some progress on the layout,im still waiting on code 70 rail joiners I use atlas code 80 n-scale joiners for my code 70 rail. They are a little loose, but a slight squeeze with the needlenose pliers solves that. Plus, they are cheaper, and more readily available. Re: finally building layout - Bigsteel - 03-24-2009 Russ Bellinis Wrote:I just checked my Walthers catalog and Micro Engineering and Shinohara both offer r-t-r turnouts in code 70. Micro Engineering only offers #6 & #8 while Shinohara offers them in #4 as well. thanks alot russ,im getting tired of hand laying all these CV kits,its not that i cant do it,but all the fiddling with them just doesnt seem worth it to me.especially since i probably wont use the super detailing kits that came with them.so thanks ![]() |