10-30-2013, 02:25 PM
quick two pictures of the current status:
![[Image: report2013-10-30aaiq39.jpg]](http://abload.de/img/report2013-10-30aaiq39.jpg)
![[Image: report2013-10-30bpio4y.jpg]](http://abload.de/img/report2013-10-30bpio4y.jpg)
Next step will be the slope of the former steep section towards the upper town and the street. Then I can fill up the courtyard flush to the top of the grooved rails with dental plaster.
For the factory building I've already ordered Kibri wall panels for the floor. The upper floors arise from Auhagen plates for trapezoidal sheet, so this construction goes on soon.
![[Image: report2013-10-30aaiq39.jpg]](http://abload.de/img/report2013-10-30aaiq39.jpg)
![[Image: report2013-10-30bpio4y.jpg]](http://abload.de/img/report2013-10-30bpio4y.jpg)
Next step will be the slope of the former steep section towards the upper town and the street. Then I can fill up the courtyard flush to the top of the grooved rails with dental plaster.
For the factory building I've already ordered Kibri wall panels for the floor. The upper floors arise from Auhagen plates for trapezoidal sheet, so this construction goes on soon.
greetings from northern Germany
Joerg
Indiana City, my layout
http://www.the-gauge.net/forum/viewtopic...=46&t=5379
Joerg
Indiana City, my layout
http://www.the-gauge.net/forum/viewtopic...=46&t=5379