Indiana City
#71
Before I pour the yard again with plaster, I will have finished the ground floor of the factory building. It will then give a precise transition to the ground.

In the week the ordered wall plates from Kibri had come and in that I had the ground floor preplanned I could start it right.

[Image: report2013-11-10asac48.jpg]

[Image: report2013-11-10bl8c0p.jpg]

The first plates were connected quickly and holes were cut for windows and doors. From behind strips of the same material were glued to get a little depth into the wall.

[Image: report2013-11-10cp9iar.jpg]

[Image: report2013-11-10dwfe3y.jpg]

Of course, the edges to the wall have to be smooth and the wall joints must be clean scratched. On the left window I have it already made.

The courtyard entrance door gets steel doors with steel frames. I had drawn a template some times ago. I've printed it out, glued it to thin cardboard and cut out.

[Image: report2013-11-10elvdsz.jpg]

[Image: report2013-11-10f7xcsr.jpg]

Windows and doors will be created with the help of textures. I like to use the ones of this page:

CG-Textures

I edit them with Corel Draw.

[Image: report2013-11-10gaad77.jpg]

[Image: report2013-11-10hw6fth.jpg]

[Image: report2013-11-10igcf46.jpg]

But before the texture images can be stuck there, the walls needs to be finished and painted with colors.

As far as the current week report.

[Image: thank_you.gif]
greetings from northern Germany
Joerg

Indiana City, my layout
http://www.the-gauge.net/forum/viewtopic...=46&t=5379
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)