Freelance 2013-3
#86
The last kit is assembled and placed in the middle of the row. The building has some nice but to unique side walls to be placed alone. It does not match the style of the other buildings at all.
(McAdam St. resin kit from Lunde Studios)
[Image: IMG_2833_zps0e01e4e4.jpg]

The center building replaces the low building at the left hand and forms a canyon with the building right hand.
[Image: IMG_2834_zps7f65476b.jpg]

That completes the building replacement operation in the rear west end corner. All buildings are "put" in place only and can be easy further detailed at the workbench. Anyhow my technique of detailing and weathering plain brick walls needs still to be improved.
[Image: IMG_2835_zpsa5b7161b.jpg]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)