12-15-2013, 09:23 AM
The old yard wit the space saving 3-way Peco switch
![[Image: IMG_2923_zps803d4833.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/Misc-3/IMG_2923_zps803d4833.jpg)
The plan to get rid of the tight curves of the switch and sacrifice one stub track
![[Image: IMG_2924_zpsaf0d23a5.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/Misc-3/IMG_2924_zpsaf0d23a5.jpg)
Two hours later
![[Image: IMG_2925_zps1d3b2f57.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/Misc-3/IMG_2925_zps1d3b2f57.jpg)
Next week: Doing all the dirt work of ballast and ground cover
ps. Six switches remaining on the layout but 17 toggle switches in the fascia from the beginning. It is a long way to get layout space and track complexity in balance....
pps. note the urban side walk along the industry wall
![[Image: IMG_2923_zps803d4833.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/Misc-3/IMG_2923_zps803d4833.jpg)
The plan to get rid of the tight curves of the switch and sacrifice one stub track
![[Image: IMG_2924_zpsaf0d23a5.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/Misc-3/IMG_2924_zpsaf0d23a5.jpg)
Two hours later
![[Image: IMG_2925_zps1d3b2f57.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/Misc-3/IMG_2925_zps1d3b2f57.jpg)
Next week: Doing all the dirt work of ballast and ground cover
ps. Six switches remaining on the layout but 17 toggle switches in the fascia from the beginning. It is a long way to get layout space and track complexity in balance....
pps. note the urban side walk along the industry wall
Reinhard