03-22-2014, 03:44 PM
Thank you all.
The back work including lighting are almost done and the offices equipped with some figures.
The remaining free window in the bottom row will get milk glass panes as for toilets.
![[Image: report2014-03-22axyz0h.jpg]](http://abload.de/img/report2014-03-22axyz0h.jpg)
![[Image: report2014-03-22be8xy5.jpg]](http://abload.de/img/report2014-03-22be8xy5.jpg)
The windows of the ground floor and a loading gate have also received their textures.
The back work including lighting are almost done and the offices equipped with some figures.
The remaining free window in the bottom row will get milk glass panes as for toilets.
![[Image: report2014-03-22axyz0h.jpg]](http://abload.de/img/report2014-03-22axyz0h.jpg)
![[Image: report2014-03-22be8xy5.jpg]](http://abload.de/img/report2014-03-22be8xy5.jpg)
The windows of the ground floor and a loading gate have also received their textures.
greetings from northern Germany
Joerg
Indiana City, my layout
http://www.the-gauge.net/forum/viewtopic...=46&t=5379
Joerg
Indiana City, my layout
http://www.the-gauge.net/forum/viewtopic...=46&t=5379
