Planning an N Scale E shaped ISL - 9ft 6 in X 9ft 6in
#8
The Switching AREA 2 conversation regarding use of a shoving platform may be influenced by my core time frame of 1970-80 and how many code 80 switches I have.
-------------------------------------------------
Ah,you will be using a caboose since you have a 4-5 man crew-on some locals with lots of switching a third brakeman was added to speed up the work.The conductor usually supervised the work and made sure safety and operating rules was followed.If the crew was going for a early quit then he would jump in and help do the work.

Normal crew size on most railroads between 70-80 was four men consisting of engineer,head brakeman,rear brakeman and conductor.
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)