03-03-2009, 09:21 PM
And then i started to roughly layout the track in this area to see if it would actually work, not just on paper.
![[Image: image.php?album_id=80&image_id=664]](http://www.the-gauge.net/forum/gallery/image.php?album_id=80&image_id=664)
At the right is where the track will head through the wall onto a 10' section and eventually return to the main room.
![[Image: image.php?album_id=80&image_id=663]](http://www.the-gauge.net/forum/gallery/image.php?album_id=80&image_id=663)
This area will have a siding and an industry spur about halfway back in the train
![[Image: image.php?album_id=80&image_id=666]](http://www.the-gauge.net/forum/gallery/image.php?album_id=80&image_id=666)
Will post more as the week progress's
At the right is where the track will head through the wall onto a 10' section and eventually return to the main room.
This area will have a siding and an industry spur about halfway back in the train
Will post more as the week progress's
That light at the end of the Tunnel isn't heaven.........ITS A TRAIN!
My Railpictures.net Pictures
My Ramblings and Pictures
My Railpictures.net Pictures
My Ramblings and Pictures