12-08-2014, 11:26 AM
All "brick boxes" are finally assembled and got a roof. The white primer was rattle can sprayed on the cold balcony and one layer of diluted brown is applied to get rid of the disturbing pure white objects all over the layout. That completes the batch mode. I will now proceed with the individual buildings as time permits.
![[Image: IMG_3812_zps79e98df7.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3812_zps79e98df7.jpg)
ps. At the top end of the photo in the very corner is a switch to operate the venetian blinds. The new structures get in perfect touch with my belly operating those switch each morning and evening. My shorter wife complained already. I need to fix that issue a.) taller wife, b.) lower buildings, c.)I think I will get a remote control for the venetian blind in 2015.
![[Image: IMG_3812_zps79e98df7.jpg]](http://i966.photobucket.com/albums/ae149/faraway52/FL2014-2/IMG_3812_zps79e98df7.jpg)
ps. At the top end of the photo in the very corner is a switch to operate the venetian blinds. The new structures get in perfect touch with my belly operating those switch each morning and evening. My shorter wife complained already. I need to fix that issue a.) taller wife, b.) lower buildings, c.)I think I will get a remote control for the venetian blind in 2015.

Reinhard