05-08-2015, 07:20 AM
Hi there,
here´s a short update on my layout.I´m back into structure building or better scratchbuilding and kitbashing. First I started on the additional structures for my G.E.R.N. Industries complex. The loading shed is made from styrene and some Pikestuffparts glued onto the white plastic.I´ll add a corrugated metal roof and two walkways with ladders and some more little details...Behind the shed I added an addition to the elevator house from made from leftover metalsiding. I found some pictues online showing the prototype version of a similar structure....Still a lot to do on this strutures.
![[Image: 08.05.15%2B-%2B2]](https://lh3.googleusercontent.com/-tWCTMP2JJyY/VUy2um_2KaI/AAAAAAAAI3E/N4Nug8ZmjgM/w993-h558-no/08.05.15%2B-%2B2)
![[Image: 08.05.15%2B-%2B1]](https://lh3.googleusercontent.com/-BiGxazLlGSI/VUy2ugN67MI/AAAAAAAAI3E/-vVAUaeGKAc/w993-h558-no/08.05.15%2B-%2B1)
The second structure I started with was for Wright Food Service Ltd. It will be scratchbuild from styrene sheet. The truckramp is also also scratchbuild...have to add the front and roof....also still a lot of work to do.....
![[Image: wreight%2Bfood%2Bservice%2B-%2B1]](https://lh3.googleusercontent.com/-6IBz4ar7vCw/VUw5qOroBbI/AAAAAAAAI00/jXeo4ZBUOaQ/w993-h558-no/wreight%2Bfood%2Bservice%2B-%2B1)
More progress will,soon....
Cheers,Chris
here´s a short update on my layout.I´m back into structure building or better scratchbuilding and kitbashing. First I started on the additional structures for my G.E.R.N. Industries complex. The loading shed is made from styrene and some Pikestuffparts glued onto the white plastic.I´ll add a corrugated metal roof and two walkways with ladders and some more little details...Behind the shed I added an addition to the elevator house from made from leftover metalsiding. I found some pictues online showing the prototype version of a similar structure....Still a lot to do on this strutures.
The second structure I started with was for Wright Food Service Ltd. It will be scratchbuild from styrene sheet. The truckramp is also also scratchbuild...have to add the front and roof....also still a lot of work to do.....

More progress will,soon....
Cheers,Chris
Building the BC-Rail Dawson Creek Subdivision in H0 scale http://bigbluetrains.com/forum/viewtopic.php?f=46&t=7835