05-21-2015, 08:06 AM
Hi there,
thanks.....
I made some progress on two of my current projects. First one is Wreughts Food Service LTD. I added the additional buildings. I´ll add another structure to the roof of the bigger structure with the truckramp.I´ll also build a base for the structures to rise them to tracklevel...
![[Image: 20150512_001957.jpg]](https://lh5.googleusercontent.com/-BetRfk6NpNw/VVINNrFCGpI/AAAAAAAAI8c/RUWGArJ90OY/w993-h558-no/20150512_001957.jpg)
![[Image: 12.05.15%2B-%2B3]](https://lh3.googleusercontent.com/-9MFJk0peopU/VVINNheeQ0I/AAAAAAAAI8c/r8v2WiU1S4U/w993-h558-no/12.05.15%2B-%2B3)
![[Image: 12.05.15%2B-%2B2]](https://lh3.googleusercontent.com/-EIYLXoDd224/VVINNhwXJ9I/AAAAAAAAI8c/ewUGCx-KNUs/w993-h558-no/12.05.15%2B-%2B2)
![[Image: 20150512_001836.jpg]](https://lh3.googleusercontent.com/-CXcVPm9pKpY/VVITA0oJ55I/AAAAAAAAI_4/Z0HAdHaqp_I/w993-h558-no/20150512_001836.jpg)
The other project is my G.E.R.N. Industries complex. Worked on the millbuilding and changed one wall,added a roof extension.The walls for the extension are scratchbuild from styrene sheet....
![[Image: 21.05.15%2B-%2B2]](https://lh3.googleusercontent.com/-llTy5AqeENA/VV2lKXx7D7I/AAAAAAAAJGc/PKGFBUeF5HM/w993-h558-no/21.05.15%2B-%2B2)
![[Image: 21.05.15%2B-%2B1]](https://lh3.googleusercontent.com/-S0ncw_ALHX0/VV2lKfp91QI/AAAAAAAAJGc/eD3YSOfx7LY/w993-h558-no/21.05.15%2B-%2B1)
![[Image: 21.05.15%2B-%2B6]](https://lh3.googleusercontent.com/-0IuQutmQVQY/VV2lKU82xtI/AAAAAAAAJGc/RfzN4oeBoaw/w993-h558-no/21.05.15%2B-%2B6)
More progress will follow soon. I will paint the Mill complex Tamiya Desert Yellow and add some weathering later.Doors and windows will be painted green matching the G.E.R.N. logo and the metal sidings will be painted a metal color.......
Wright´s will be painted a light grey,white roof on the building with the tracks and fine ballast for the other flat roofs. Doors and windows will be painted blue...So that´s my plan for the next time....more progress on those structures, adding a blue sky to the backdrop,painting trackwork etc.....
Thanks for looking,
Cheers,Chris
thanks.....
I made some progress on two of my current projects. First one is Wreughts Food Service LTD. I added the additional buildings. I´ll add another structure to the roof of the bigger structure with the truckramp.I´ll also build a base for the structures to rise them to tracklevel...
![[Image: 20150512_001957.jpg]](https://lh5.googleusercontent.com/-BetRfk6NpNw/VVINNrFCGpI/AAAAAAAAI8c/RUWGArJ90OY/w993-h558-no/20150512_001957.jpg)
![[Image: 20150512_001836.jpg]](https://lh3.googleusercontent.com/-CXcVPm9pKpY/VVITA0oJ55I/AAAAAAAAI_4/Z0HAdHaqp_I/w993-h558-no/20150512_001836.jpg)
The other project is my G.E.R.N. Industries complex. Worked on the millbuilding and changed one wall,added a roof extension.The walls for the extension are scratchbuild from styrene sheet....
More progress will follow soon. I will paint the Mill complex Tamiya Desert Yellow and add some weathering later.Doors and windows will be painted green matching the G.E.R.N. logo and the metal sidings will be painted a metal color.......
Wright´s will be painted a light grey,white roof on the building with the tracks and fine ballast for the other flat roofs. Doors and windows will be painted blue...So that´s my plan for the next time....more progress on those structures, adding a blue sky to the backdrop,painting trackwork etc.....
Thanks for looking,
Cheers,Chris
Building the BC-Rail Dawson Creek Subdivision in H0 scale http://bigbluetrains.com/forum/viewtopic.php?f=46&t=7835