03-15-2009, 05:20 PM
Hi All,
Spent the day with the drill wire and soldering iron finishing off the right hand end of the board all but for the short end tracks from the shop i will sort when the building is fixed down.
![[Image: Picture1001.jpg]](http://i549.photobucket.com/albums/ii377/upnick/Picture1001.jpg)
Looking from the centre of the boards towards the right end Three roads to shop laid ...... rails joiners holding them in place while the glue sets, once the building is finished dropper wires will supply power into the shop and eliminate the need for joiners.
![[Image: Picture1008.jpg]](http://i549.photobucket.com/albums/ii377/upnick/Picture1008.jpg)
Looking toward the left end of the boards the plasticard with the 30 on hopefully gives you the idea of the two tracks from the right running into the bottom of the picture here ......... trackbed crossing the board needs track on to link the top/bottom roads and the points before the iron three tracks will go to the ends or start to curve to the left of the picture onto board 5 if the locos can cope with the curve leading to storage ....... the right side of the picture is to have the scrapyard still in the planning.
![[Image: Picture1006.jpg]](http://i549.photobucket.com/albums/ii377/upnick/Picture1006.jpg)
Close up of the shop with two walls mocked up.
Spent the day with the drill wire and soldering iron finishing off the right hand end of the board all but for the short end tracks from the shop i will sort when the building is fixed down.
![[Image: Picture1001.jpg]](http://i549.photobucket.com/albums/ii377/upnick/Picture1001.jpg)
Looking from the centre of the boards towards the right end Three roads to shop laid ...... rails joiners holding them in place while the glue sets, once the building is finished dropper wires will supply power into the shop and eliminate the need for joiners.
![[Image: Picture1008.jpg]](http://i549.photobucket.com/albums/ii377/upnick/Picture1008.jpg)
Looking toward the left end of the boards the plasticard with the 30 on hopefully gives you the idea of the two tracks from the right running into the bottom of the picture here ......... trackbed crossing the board needs track on to link the top/bottom roads and the points before the iron three tracks will go to the ends or start to curve to the left of the picture onto board 5 if the locos can cope with the curve leading to storage ....... the right side of the picture is to have the scrapyard still in the planning.
![[Image: Picture1006.jpg]](http://i549.photobucket.com/albums/ii377/upnick/Picture1006.jpg)
Close up of the shop with two walls mocked up.
<!-- m --><a class="postlink" href="http://www.freewebs.com/upnick/">http://www.freewebs.com/upnick/</a><!-- m -->
![[Image: up_xm40o.gif]](http://i549.photobucket.com/albums/ii377/upnick/up_xm40o.gif)
![[Image: up_lo-1.gif]](http://i549.photobucket.com/albums/ii377/upnick/up_lo-1.gif)
![[Image: up_xm40o.gif]](http://i549.photobucket.com/albums/ii377/upnick/up_xm40o.gif)
![[Image: up_lo-1.gif]](http://i549.photobucket.com/albums/ii377/upnick/up_lo-1.gif)
