03-18-2009, 03:22 PM
Well, I've got started enough to show how great I can dream.
The cutout place is the river, and where it stops will be a dam with swimmers above it. I just spread some track to show how it will follow a cutout. I'm trying to build a general topography before I start plster strips. It is 57" X 14'. Half is still level, but hopefully not for long. I hope for a town along the river. I haven't figured if I can put in a second track yet.
The cutout place is the river, and where it stops will be a dam with swimmers above it. I just spread some track to show how it will follow a cutout. I'm trying to build a general topography before I start plster strips. It is 57" X 14'. Half is still level, but hopefully not for long. I hope for a town along the river. I haven't figured if I can put in a second track yet.
Whitehouse, Tx