DEE_STRUSHUN
#5
Well, I've got started enough to show how great I can dream.
The cutout place is the river, and where it stops will be a dam with swimmers above it. I just spread some track to show how it will follow a cutout. I'm trying to build a general topography before I start plster strips. It is 57" X 14'. Half is still level, but hopefully not for long. I hope for a town along the river. I haven't figured if I can put in a second track yet.


Attached Files Image(s)
           
Whitehouse, Tx
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)