11-17-2015, 08:57 AM
With the 4th stage (out of 5) of the layout now up and running we held a operating session yesterday and it went well. Now I have to work up the nerve to punch a hole thru the wall
into the hallway so the final section of the layout can be built.
into the hallway so the final section of the layout can be built.
Mike
Sent from my pocket calculator using two tin cans and a string
Sent from my pocket calculator using two tin cans and a string

