12-23-2015, 09:03 PM
What I have now was started in 1996. Well if you count the planning it started in 94. There have been many changes.
Started with 2 helix's now has none.
Started with 2 levels now has one main level, one short line with multiple levels.{my layout is Wv.& Va.} has one level of hidden yards with 2 tracks dropping about 1 foot in about 15 feet for each yard one east one west.
in 07 I had to make major changes for access due to health problems. I am still working on these changes and don't think I will ever completely finish them.So 20 years on it and still not finished.OOPs make that 22 with planning.
Started with 2 helix's now has none.
Started with 2 levels now has one main level, one short line with multiple levels.{my layout is Wv.& Va.} has one level of hidden yards with 2 tracks dropping about 1 foot in about 15 feet for each yard one east one west.
in 07 I had to make major changes for access due to health problems. I am still working on these changes and don't think I will ever completely finish them.So 20 years on it and still not finished.OOPs make that 22 with planning.
Oh yea is satisfied kinda like happy?
Les
<!-- m --><a class="postlink" href="http://www.lesterperry.webs.com/">http://www.lesterperry.webs.com/</a><!-- m --> Check it out
http://www.youtube.com/lesterperry/
<!-- m --><a class="postlink" href="http://www.lesterperry.webs.com/">http://www.lesterperry.webs.com/</a><!-- m --> Check it out
http://www.youtube.com/lesterperry/