New track plan # 2
Last time around. I changed a few things after some suggestions I received. The cattle area was slanted away from the edge of the table.
The industry area was also slanted and a small curve put in. The end curve will drop down at 2.5% grade from 4" to 0" and then go into a tunnel, giving me the whole top for industry. There will be a concrete retaining wall on the inside of the curve. Also added a small river, great idea Galen !
On another happy note, I spent all the money I had saved on track. Last night my wife asked me how much track I still needed. Then she said go ahead and buy it Eek Then she said and go ahead and buy that cuuute little train ( one car is a train to her) you have been looking at. Eek So, I have all the track and joiners on the way 2285_ And, a Mantua 0-6-0-T Big Grin What a gal !
Now, if you will will excuse me, I am going to cut some lumber Big Grin

Loren


Attached Files Image(s)
   
I got my first train when I was three,
put a hundred thousand miles on my knees.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)