01-14-2016, 10:18 AM
I have made some revisions to the plan:
![[Image: Rethink%201_zpsg4kcsw8n.png]](http://i208.photobucket.com/albums/bb161/jhockuk/Rethink%201_zpsg4kcsw8n.png)
I have swapped out the plywood factory for a lumber yard, as much as I like the idea of the plywood factory I struggle with how plausible the concept is, plus I have loads of stuff to outfit a lumber yard / building suppliers yard that I want to use.
I can still have the log cars and wood chip cars on the layout, they will just have to be on the storage spur at the front.
I have also added a covered loading area to the cardboard manufacturer, this will allow the covered hoppers of corn starch to be unloaded under cover.
![[Image: Rethink%201_zpsg4kcsw8n.png]](http://i208.photobucket.com/albums/bb161/jhockuk/Rethink%201_zpsg4kcsw8n.png)
I have swapped out the plywood factory for a lumber yard, as much as I like the idea of the plywood factory I struggle with how plausible the concept is, plus I have loads of stuff to outfit a lumber yard / building suppliers yard that I want to use.
I can still have the log cars and wood chip cars on the layout, they will just have to be on the storage spur at the front.
I have also added a covered loading area to the cardboard manufacturer, this will allow the covered hoppers of corn starch to be unloaded under cover.