09-16-2016, 10:31 PM
Okay, I did a bit of re-engineering:
![[Image: DSCF6310_zps2nftvebf.jpg]](http://i219.photobucket.com/albums/cc278/OkanaganIroc/model%20railroad/Engines/MDC%202-8-0%20CNR/DSCF6310_zps2nftvebf.jpg)
I used the suggested procedure and I think it looks better now. I wasn't able to use the stand-offs on the boiler front but I might make marker light mounts out of those then.
![[Image: DSCF6313_zpsijwk03yn.jpg]](http://i219.photobucket.com/albums/cc278/OkanaganIroc/model%20railroad/Engines/MDC%202-8-0%20CNR/DSCF6313_zpsijwk03yn.jpg)
I still have to solder the cross brace on the front and I noticed that I could use some filler where the steps attach to the boiler walkways.
![[Image: DSCF6310_zps2nftvebf.jpg]](http://i219.photobucket.com/albums/cc278/OkanaganIroc/model%20railroad/Engines/MDC%202-8-0%20CNR/DSCF6310_zps2nftvebf.jpg)
I used the suggested procedure and I think it looks better now. I wasn't able to use the stand-offs on the boiler front but I might make marker light mounts out of those then.
![[Image: DSCF6313_zpsijwk03yn.jpg]](http://i219.photobucket.com/albums/cc278/OkanaganIroc/model%20railroad/Engines/MDC%202-8-0%20CNR/DSCF6313_zpsijwk03yn.jpg)
I still have to solder the cross brace on the front and I noticed that I could use some filler where the steps attach to the boiler walkways.
