The Hobo Camp Fire Is going well #VII.. Stop In!!!
House work day here.
I spent a bit of time on the layout today. I had filled in a bit between the homasote and the wall with foam and the added trees to it. (Well, SWMBO added the trees; I just gkued/pinned them down.) The cat has been playing with them (we should have called him Autumn) and the glue is proving stronger than the beaded foam. So today was replace the foam with Homasote. Just for interest, an X-acto knife makes a lot less dust than a saw, but takes an hour longer.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)