04-28-2017, 02:47 AM
The contractor doing the shower got a complaint about a substandard silicone joints.
Two guys appeared this morning at 7:30am at the scene and redid it under immediate supervision of my wife. She was all the time, 2 hours, present and ensured the best possible result. That is the max penalty a craftsman can get
Two guys appeared this morning at 7:30am at the scene and redid it under immediate supervision of my wife. She was all the time, 2 hours, present and ensured the best possible result. That is the max penalty a craftsman can get
Reinhard
