The Hobo Camp Fire Is going well #VII.. Stop In!!!
We have some more trouble.
- The tabletop in the kitchen is made of two parts. The max length available was not long enough and they used two pieces. That was agreed but the joined is done with silicon only. I assumed a strong two component bound to get a seamless countertop.
- The sink should be flush in the tabletop. It is installed 1/10" sunk-in with silicon. That would be another place to collect all kind of dirt.
- The parquet got severe mechanical damaged in front of the kitchen today. A carpenter must have dropped something heavy several times.
- The subcontractor refurbishing the parquet has no clue what kind of oil/care product has been used the last time. He failed to clean it two times today. I hope he will find a way to get it clean. It looks awful at the moment.
- Movers have been postponed until Monday next week

Not a good day but another meeting 11:30h tomorrow....
Reinhard


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)