Help reading Track Diagram
#15
Larry, reading again the Erie Magazine article we learn this:

2 trains (91 from Marion to Dayton, 98 from Dayton to Marion). There could be second trains.

Ran 4 times per week, alterning. Most were night trains, except the second 98.

There was a local way freight between Dayton and Urbana that switched most industrial plants in the area.

Also, when I look at pictures in the article, I find out they switched facing point sidings too (at least in Durbin). That means they has to make a runaround move. Explains why it took so much time at that particular location. Morning Sun books has published the entire photo report in their Erie books, it's in volume 2.
Proudly modelling Quebec Railway Light & Power Company since 1997.

Hedley-Junction Club Layout: http://www.hedley-junction.blogspot.com/

Erie 149th Street Harlem Station http://www.harlem-station.blogspot.com/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)