The Hobo Camp Fire Is going well #VII.. Stop In!!!
The main rework of our condo will enter it's final stage today. The carpenter will be here at 11am for a first planning session of my room that had been excluded last year. He will also coordinate the other subcontractors. All the stuff must be packed and temporary stored, dismantlement of the layout, some electric changes, new wall papers, painting, installation of new layout benchwork and move in off all the stuff.
"Electric changes" sounds nice to American home owners but making slots in red bricks under plaster is a big mess. I did also never plan for packing all my railroad stuff. Most locomotives and cars are stored in boxes only to be moved carefully within the room. I am not sure what to do with the furniture. It is not pretty but it provides the best storage I can think of. Let's see if he has something new I did not think off.
And last not least I want to minimize the time of a) no layout at all and b) no operational layout.

The benchwork will follow a design from Alcanman. He published a great idea in FB for people like me with constant changing layouts. Basically a solid framework with easy to remove board sections on top. The base layout will not be changed. A staging yard without scenery at the north wall, the scenic part (about 4m * .5m) at the south wall and small connections with hatches at the east (door) and west (balcony and window) side.

Summary: a lot of mess and no Freelance 2018-1 soon Sad
Reinhard


Messages In This Thread

Forum Jump:


Users browsing this thread: 4 Guest(s)