07-06-2024, 04:35 PM
Spray adhesive, black painted polyfil, couple colors of green spray paint, touchups, slap some more green/brown stuff at the interface between the tailings pile and the brush above it. All told, about 15 minutes of work. It's rough and needs some tweaking (tomorrow after it's dry), but it's gonna work back there in the that corner, and I didn't have to do anything precarious to get any of it into place. It also fits in well enough with the backdrop. The transition at ground level is something I'll work on when I get a much better idea of where structures and roads will be sighted.
Check out my "Rainbows in the Gorge" website: http://morristhemoosetm.wixsite.com/rainbows