88FANS Scratchbuild '09 Challenge
#30
Tonight, I added "glass" to the inside wall.
   

I also pre cut, and fit the rest of the "glass" for the waiting area. I'm using Evergreen .020" Clear styrene for the windows. Really can't see the clear plastic, but I used blue tape to mark the location each piece is going. I then wrapped them up in tissue paper and stored them in my "accessory bin".
   

Here, is the underside of the platform, showing the styrene strip used for strength. I tell you what, those hanging paper clips sure do come in handy.
   

Test fitting the roof.
   

All the sub-assemblies, ready for detail painting, and finish assembly. I find doing sub-assembly when scratch building makes it easier for painting. Lot less masking and taping.
   
Torrington, Ct.
NARA Member #87
I went to my Happy Place, but it was closed for renovations.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)