06-24-2009, 06:38 PM
Tonight, I added "glass" to the inside wall.
I also pre cut, and fit the rest of the "glass" for the waiting area. I'm using Evergreen .020" Clear styrene for the windows. Really can't see the clear plastic, but I used blue tape to mark the location each piece is going. I then wrapped them up in tissue paper and stored them in my "accessory bin".
Here, is the underside of the platform, showing the styrene strip used for strength. I tell you what, those hanging paper clips sure do come in handy.
Test fitting the roof.
All the sub-assemblies, ready for detail painting, and finish assembly. I find doing sub-assembly when scratch building makes it easier for painting. Lot less masking and taping.
I also pre cut, and fit the rest of the "glass" for the waiting area. I'm using Evergreen .020" Clear styrene for the windows. Really can't see the clear plastic, but I used blue tape to mark the location each piece is going. I then wrapped them up in tissue paper and stored them in my "accessory bin".
Here, is the underside of the platform, showing the styrene strip used for strength. I tell you what, those hanging paper clips sure do come in handy.
Test fitting the roof.
All the sub-assemblies, ready for detail painting, and finish assembly. I find doing sub-assembly when scratch building makes it easier for painting. Lot less masking and taping.
Torrington, Ct.
NARA Member #87
I went to my Happy Place, but it was closed for renovations.
NARA Member #87
I went to my Happy Place, but it was closed for renovations.
