An engine servicing facility for the JGL
I cut the windows and main entryway out of the front wall, it will be lowered so that the window heights match the other wall. It's just sitting in place. I have one of the back walls on the workbench now, waiting for the cement I use to laminate the vivyl material to the styrene to cure. Not much else to say at this point.

   
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)