08-11-2009, 11:11 AM
I am making progress at a snail’s pace ... but I am making some progress. Since my last post I added some more details. I started with the long sidewall that will face to the tracks and the front of my layout. Viewed from that side, the structure still looked like a shoebox. So I decided to add some details you don’t find on the prototype. On a neighboring building I found a wall mounted air conditioner and some electrical boxes that I adopted for my structure.
![[Image: challenge26.jpg]](http://www.cnw.mattheydesign.de/challenge26.jpg)
Next thing on the agenda was the front door. Now the only details left to be done are 2" of fence and the windows.
![[Image: challenge27.jpg]](http://www.cnw.mattheydesign.de/challenge27.jpg)
![[Image: challenge26.jpg]](http://www.cnw.mattheydesign.de/challenge26.jpg)
Next thing on the agenda was the front door. Now the only details left to be done are 2" of fence and the windows.
![[Image: challenge27.jpg]](http://www.cnw.mattheydesign.de/challenge27.jpg)
Kurt
