08-15-2009, 09:13 PM
Thanks, Loren & Steven.
Progress has been sporadic but still pushing forward. All brick walls have been 'mortared' (no, not shelled) and I've begun installing windows. The walls also received a dry-brushing of raw umber to add another layer of color.
After all that work prepping the loading bay roof, I think I may end up scratching that roof as well. The only roof section that I'll use from the kit is the flat roof for the boilerroom/truck-loading area on the upper building. Naturally, it'll be 'upgraded' with additional details.
Although the progress has slowed somewhat, it's getting more exciting. Once the remaining few major bits are constructed, the detailing phase can begin in earnest.
More work tonight...pictures to follow eventually.
Galen
Progress has been sporadic but still pushing forward. All brick walls have been 'mortared' (no, not shelled) and I've begun installing windows. The walls also received a dry-brushing of raw umber to add another layer of color.
After all that work prepping the loading bay roof, I think I may end up scratching that roof as well. The only roof section that I'll use from the kit is the flat roof for the boilerroom/truck-loading area on the upper building. Naturally, it'll be 'upgraded' with additional details.
Although the progress has slowed somewhat, it's getting more exciting. Once the remaining few major bits are constructed, the detailing phase can begin in earnest.
More work tonight...pictures to follow eventually.
Galen
I may not be a rivet counter, but I sure do like rivets!
