#12
Tonight I finished up what you could call Phase 1. That is, all of the under-layout DCC bus wiring is installed, and the wire panel installed, wired to the busses, and powered.

[Image: IMG_3492.jpg] [Image: IMG_3491.jpg]

The next step will be to work on getting the benchwork top installed and the center divider backdrop.
Reply