I made a little progress in the past few days, just working for an hour or so when I get home from work. Even though it is supposed to be )(brrrrr cold) below freezing this weekend, it is supposed to be clear and sunny. I plan on doing alot.
Here is the electrical panel. Yeah, it is way bigger than what I need in the building, but the cost was very reasonable and it came with a main breaker, a 2-pole 30 amp (to be used for the AC and heat) and five 20 amp breakers for the lights and receptacles. I mounted the panel lower than normal so it will be under the layout. And since there is no local inspection, no issues with the inspector saying the panel can't be mounted this low.
Here is the gable end which still needs to be closed. I finished up the other gable end as shown in the second photo.
Inside the building - my tools and worktable and such.
And a photo of the eaves which I still have to box in and put in the soffit and trim.
Here is the electrical panel. Yeah, it is way bigger than what I need in the building, but the cost was very reasonable and it came with a main breaker, a 2-pole 30 amp (to be used for the AC and heat) and five 20 amp breakers for the lights and receptacles. I mounted the panel lower than normal so it will be under the layout. And since there is no local inspection, no issues with the inspector saying the panel can't be mounted this low.
Here is the gable end which still needs to be closed. I finished up the other gable end as shown in the second photo.
Inside the building - my tools and worktable and such.
And a photo of the eaves which I still have to box in and put in the soffit and trim.
Three Foot Rule In Effect At All Times