01-20-2010, 06:38 PM
As far as I know, and I hope I am wrong, no GG1 will ever operate again unless the internal equipment is replaced to eliminate the hazardous PCBs that are inside some electrical components. Some federal EPA law or something like that. I can't see why a group couldn't combine, say, a GG1 and the components from a retired E44 or E60CP, but it is prolly expensive and difficult. Plus the cracked frame problem the GG1s were known for.
For a more direct answer, no, there is no such group or set up with an operating GG1 currently, but we can all hope one day there will be.
For a more direct answer, no, there is no such group or set up with an operating GG1 currently, but we can all hope one day there will be.
-Dave