03-24-2010, 09:17 PM
You could change it over to N scale, The biggest problem is that the width of the bridge and the size of the control house, they would be huge in N scale.. I don't know if there are any of the indexing or motorised parts in either of the 2 locations that would not allow you to reduce there size to be more appropriate for N scale. There's probably enough room to double track the bridge( just think 2x the capacity ) I don't know how prototypical that would be, or if that is even a issue on your layout. Good luck with it.
My other car is a locomotive, ARHS restoration crew
