05-07-2010, 07:45 AM 
	
	
	
		Bruce...thank you very much!  
 
Galen...
I am working from plans, much like those shown in the second post of this thread:
http://www.zealot.com/forum/showthread.php?t=151596
That's the way I have petty much done all my buildings. Taking the Coal House for example, I had plans for the walls of the house itself, and the dimensions of the back wall of the coal bin area. The bins, trestle, loading dock, roofs & supports, etc were done on the fly, so to speak. So I guess it is both....plans and legitimate scratch building. Kurt does the plans, and in return, he doesn't have to look at me place an all too familiar kit stucture on the layout ...........works for me
 ...........works for me  ............and him
............and him  
	
	
	
 
 Quote:Are you working from plans or is it completely scratched?
Galen...
I am working from plans, much like those shown in the second post of this thread:
http://www.zealot.com/forum/showthread.php?t=151596
That's the way I have petty much done all my buildings. Taking the Coal House for example, I had plans for the walls of the house itself, and the dimensions of the back wall of the coal bin area. The bins, trestle, loading dock, roofs & supports, etc were done on the fly, so to speak. So I guess it is both....plans and legitimate scratch building. Kurt does the plans, and in return, he doesn't have to look at me place an all too familiar kit stucture on the layout
 ...........works for me
 ...........works for me  ............and him
............and him  
	
Steve
	
	

 

