Building a Module; CAT Equipment Rental Building
#73
ocalicreek Wrote:A few construction details that stand out in my mind from my drive to work are the ubiquitous flag person (usually women, lately) with the two-sided sign on a pole and those heavy metal 'walls' for trenching work. You know, the big steel plates with the rods in between that get dropped into a trench to prevent the sides caving in and burying the pipe fitters alive.

A cool animation would be those two sided flagman signs that flip around together. That is, on one side it's a stop sign, on the other it says 'slow'. When one person's sign says stop the other says slow, then they flip to allow the other lane of traffic to pass by. Some sort of cam and loop pulley system would work to periodically change them. Visitors may not notice unless they happen to catch it, but then they'd watch to see it happen again!

Nice work all around. You're really capturing the feeling of a construction zone. Alot to hold a viewer's interest.

Galen

Ahhhh yes the trench boxes! I think I can make a few of those, those would be great details! I dont think they would fit this construction site as no pipe is being laid and no trenches are being dug, but I could use them for some other scenes, and those fairly basic in design lol

Preiser is coming out with an animated flagman, but who knows when it will be released. If they ever come out ill get 2 of them for this scene LOL
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)