06-18-2010, 02:28 PM
My Idea for staging will be a removable staging track on the right side. Once again I got that Idea from Lance Mindheim.
The reason I didn't want to include a runaround was that I will not need one except to use as a storage track during switching, but I can store them on any unused piece of track, so that shouldn't be a problem.
Pics are coming, I will post some after I complete Benchwork in a couple of days, so stay tuned
The reason I didn't want to include a runaround was that I will not need one except to use as a storage track during switching, but I can store them on any unused piece of track, so that shouldn't be a problem.
Pics are coming, I will post some after I complete Benchwork in a couple of days, so stay tuned
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
