In the South
#60
Work has started on the north industry district. First raw buildings are erected. The right most building front is the old backside of the "open building" some time ago discussed here. I will try to reuse it here. Btw. all other buildings not currently on the layout have been scraped last week. The space used in the cellar by old building was no longer acceptable.
[Image: Img_0384.jpg?t=1287836007]

The corner got a custom fit building that is also limited in it's hight as the window runs over it (German windows are different from US windows, they are one part to swing and/or tile). The rear track is the "one track staging yard" running hidden through all building. Therefor all buildings have some way to remove the roof or the entire building in case access to the track is required.
[Image: Img_0385.jpg?t=1287836165]

Further work on the layout might slow down somewhat because my summer off time is over and I will be back to work (mostly home office) on Monday... Looking forward for the 1.st April 2011 to start the next six month summer off periode Big Grin
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)