12-12-2010, 10:13 PM
Haven't done any, but will be doing some highway bridges over a couple of the bayous and creeks on the layout. Don't know when I will get to them though.
I need to get back to work on this bridge, some drainage channels on the right side and then the terrain on both sides, and ballast on the approaches.
I need to get back to work on this bridge, some drainage channels on the right side and then the terrain on both sides, and ballast on the approaches.
