WOOHOO! Good weather = time to build
Time to get back to work on the layout. Haven't made any significant progress in two weeks. I started on the area around the south Wayside bridge last night. Here is a repost of what I am attempting to do.

   

And dimensions of the two buildings which will go against the backdrop:

   

   

And some images of the two buildings:

   

   

   

   

And the little bit of work done so far. Basically just cut the foam down to the proper level to match the height of the terrain at the bridge, and measured the areas for the parking lots. Hope to accomplish alot over the holidays.

   
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)