12-28-2010, 02:06 AM
The restructuring of the foreground buildings continues on the right side. The raw buildings structure has been build last night and I cleaned up the area on the layout early this morning. There are still some traces on the floor... have to clean it up. The openings for loading docks etc. have been deferred intentionally to have a homogeneous styrene sheet be be bent around the curve.
![[Image: Img_0482.jpg?t=1293522779]](http://i966.photobucket.com/albums/ae149/faraway52/In%20the%20South/Img_0482.jpg?t=1293522779)
This building is more far away from my standard sitting position and does not block my immediate view. It can not be final glued in place because it spans over the boarder of the removeable door segment.
![[Image: Img_0483.jpg?t=1293522779]](http://i966.photobucket.com/albums/ae149/faraway52/In%20the%20South/Img_0483.jpg?t=1293522779)
ps. The white paint will come on the building when the white stuff visible through the window disappears ... I need frost-proof paint in spray cans!
![[Image: Img_0482.jpg?t=1293522779]](http://i966.photobucket.com/albums/ae149/faraway52/In%20the%20South/Img_0482.jpg?t=1293522779)
This building is more far away from my standard sitting position and does not block my immediate view. It can not be final glued in place because it spans over the boarder of the removeable door segment.
![[Image: Img_0483.jpg?t=1293522779]](http://i966.photobucket.com/albums/ae149/faraway52/In%20the%20South/Img_0483.jpg?t=1293522779)
ps. The white paint will come on the building when the white stuff visible through the window disappears ... I need frost-proof paint in spray cans!
Reinhard