01-09-2009, 07:26 PM
Little updating here, I'm leaning more tward two main buildings, a plastics plant (Walthers Magic Pan Bakeries) and a pipe factory (Walthers Machine Shop) which will be not be used for a railroad machine shop
I ended up curving the straight after the plastics plant to make room for more centerflow hoppers, after I finalize the location I'll make the piping system to feed the silos. I also got to look for some surge bins or a pump house outside.
I ended up curving the straight after the plastics plant to make room for more centerflow hoppers, after I finalize the location I'll make the piping system to feed the silos. I also got to look for some surge bins or a pump house outside.
Tom
Model Conrail
PM me to get a hold of me.
Model Conrail
PM me to get a hold of me.