Just tinkering with my 1st section of the layout
#8
Little updating here, I'm leaning more tward two main buildings, a plastics plant (Walthers Magic Pan Bakeries) and a pipe factory (Walthers Machine Shop) which will be not be used for a railroad machine shop 35

I ended up curving the straight after the plastics plant to make room for more centerflow hoppers, after I finalize the location I'll make the piping system to feed the silos. I also got to look for some surge bins or a pump house outside.

[Image: DSC05367.jpg]
Tom

Model Conrail

PM me to get a hold of me.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)