Freelance 2011
#66
Here we go with a hand drawn track map.

[Image: trackmap01.jpg?t=1303499651]

The tracks 1,2,3 are the new classification tracks. They are served from track 4. Track 5 is the main track.
Track 6 is an industry lead used to serve the industry at tracks 7 - 13.
At the moment is track 6 connected to the main track (5) on both sides. It might be used as another siding/run around for track 5 and the current layout permits to serve 7-9 from the left side and 11-13 from the right side.. That is not my intention but a leftover from the old layout design.
Question:
How about disconnection track 6 at the right side from track 5 and remove the turnout? The right part of track 6 will be used as a lead track to reach tracks 10 - 13. The left side will be the one and only connection to the main track.


Remark: The industry and the detailed track plan of the tracks 7 - 13 will be changed in further steps as I build new industry.
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)