Changes that have been made include:
- 1. Took one Bridge Crane out and spaced the 3 equally
2. Made the BOF twice as big and added more tracks. The BOF can have rail docks along the bottom section of the building. Along the left wall section can be some truck docks in between the tracks. The top track for that runs through the BOF is a track so that Hot Metal Bottle Cars can reach the OHF and the EAF without hitting the mainline tracks.
3. Added the Rolling Mill in its spot with the 3 tracks equally spaced inside running the entire length of the building. The tracks at the left side of the Rolling Mill will lead to the yard on the left side of the layout (still needs to be added)
4. Added the large Open Hearth Furnace (OHF) backround building which will tower over the Rolling Mill by 12"
5. Added the Electric Arc Furnace (EAF) backround building
6. Added a Machine Shop next to the rolling mill where as Wayne said is where making spare and repair parts for on-site steel mill machines. This building is 2 Walthers Allied Rail Re-builders Car Shops