ONR Switching Layout
#5
I finally finished the benchwork this weekend. I originally planned to use the lumber I had left over from a prevoious layout but my dad used most of it for a table, so instead I built the new benchwork during some spare time in woodshop at school. Luckily there was plenty of scrap lumber so I got it all for free. It was alot better quality than the stuff I already had, too. All I need now is some folding legs, which I might be able to find at school, but I doubt it.

I don't have any pictures yet (although there's not much to see). Our computer got a virus and crashed so I still have to find the camera software and load it in. I'm planning on starting the track this week, but knowing me it'll probably be another two weeks before that happens 357 .
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)