05-19-2011, 07:41 PM
Continueing on.....
![[Image: train030.jpg]](http://i1143.photobucket.com/albums/n624/dwight3477/home%20layout/train030.jpg)
The third trestle is installed.
As I think I said earlier, there is not much of my layout that is not elevated. There are three elevations and I hope to get a picture of one area that will have a train exiting a tunnel, with two trains passing overhead on two different elevations.
One of the tracks on the top level exiting the three trestle gorge area enters a station and industry area. This is shown here.
![[Image: train031croped.jpg]](http://i1143.photobucket.com/albums/n624/dwight3477/home%20layout/train031croped.jpg)
My next priority is to start building structures so I can begin to place them and work on the scenery.
As I said, it is a totally freelanced layout.....doesn't have a name yet. But I am sure something will develop.
![[Image: train030.jpg]](http://i1143.photobucket.com/albums/n624/dwight3477/home%20layout/train030.jpg)
The third trestle is installed.
As I think I said earlier, there is not much of my layout that is not elevated. There are three elevations and I hope to get a picture of one area that will have a train exiting a tunnel, with two trains passing overhead on two different elevations.
One of the tracks on the top level exiting the three trestle gorge area enters a station and industry area. This is shown here.
![[Image: train031croped.jpg]](http://i1143.photobucket.com/albums/n624/dwight3477/home%20layout/train031croped.jpg)
My next priority is to start building structures so I can begin to place them and work on the scenery.
As I said, it is a totally freelanced layout.....doesn't have a name yet. But I am sure something will develop.
