05-27-2011, 09:02 AM
Sorry for the previous larger-than screen photos - I'm using a newer software that I havent quite mastered yet.
Anyway, here's the train heading down the gulch:
And out the tunnel and under the bridge, connecting with the standard-gauge:
Instructions are to wait until after dark to transfer the load (I need to go to work), so the rest will have to wait until later.
Anyway, here's the train heading down the gulch:
And out the tunnel and under the bridge, connecting with the standard-gauge:
Instructions are to wait until after dark to transfer the load (I need to go to work), so the rest will have to wait until later.
--
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->
