06-02-2011, 07:40 PM
Thanks everyone. SP1 just check closer to the beginning of this thread and you'll see the build with lots of pics of the X-former rack. I got to do a little more detail work the the roundhouse aria. First I want to show an over view of the facility to give a feel for the site. With all the moving around I damaged some of the upper windows of the main round house, maybe that will be the excuse that I need to finish them up.
You can see I am placing a few more utility poles around the turntable and I decided to relocate the Sand/water bridge to the other side of the Coal dock.
I also finished up the details on the unloading ramp for the sand house.
Drop bottom Gons unload sand into the pit where an auger carries it into the sand house where it is screened and dried. From there compressed air carries it, via underground lines, to the bridge for loading into locomotives.
My other car is a locomotive, ARHS restoration crew
